The Hidden Cost of 1-Minute Blackouts: A Boss’s Nightmare
In today’s digitally-driven economy, 98% of businesses report operational disruptions from power outages lasting under 60 seconds. Consider these real-world impacts:
- Manufacturing: $18,000/minute loss from frozen production lines (IBM Study).
- Healthcare: 72% of hospitals face life-threatening risks during surgery blackouts.
- Data Centers: 2-second outage = 37 minutes of recovery time (Ponemon Institute).
At Wiseke Power, we’ve helped many enterprises eliminate these risks through ATS-enabled standby generators – here’s your blueprint to outage-proof operations.
The ATS Advantage: How Smart Power Transfer Saves Millions
Automatic Transfer Switches (ATS) are the brain behind mission-critical backup systems:
Scenario | ATS Response Time | Human Intervention |
---|---|---|
Grid Power Failure | 2-10 Seconds | None Required |
Generator Startup Signal | <1 Second | None Required |
Grid Power Restoration | 30-Second Cooldown | None Required |
Who Needs ATS Generators? Industry-Specific Solutions
- Healthcare
- Surgical ICU: 0-second transfer via dual ATS redundancy.
- Industrial
- Mining: Explosion-proof ATS for hazardous zones.
- Manufacturing: Phase-loss protection for CNC and various kinds of machines.
- Commercial
- High-Rise Buildings: ATS for elevator rescue.
- Data Centers: ATS for keep important data safe.
Wiseke’s ATS Generator : Beyond Basic Backup
